Day 7
so i went to frozencpu and picked up lots of stuff. i got around 12 rubber gaskets for shrouds since feser is stupid and made it so you can't use it side by side.

picked up 100ft of 1/4" black sleeving

100 ft of 1/8" black sleeving.

30 ft of 1/8" black heatshrink

30 ft of 1/4" black heatshrink

haha.. yea.. most of the sleeving that i picked up for valkyrie has been used up.. well 1/8" anyway.. but the 1/4", i still have an ok amount of. i know i won't be needing to pick up any more sleeving and heatshrink for a long long time.
here is a shot of how i think i'll be arranging 2 of the 4 pumps... the last two will be in the lower compartment sitting on top of the fans. using the UN Z-bracket with pump stands.
in all honesty, i haven't gotten far at all with this build... hopefully it'll start picking up once i get the rad grilles so i know where i need to start cutting.
until next time my brethern!
* This Worklog post was generated using WorklogCreator - Version: 1.0.0.7
* Free Download:
http://www.mod2software.com/worklogc...logcreator.zip