yesterday I blasted out the 80mm hole forgetting to mark screw holes while I had center. made up for it using one of the ac ryan grilles. marked the screw holes and drilled them out on the press

next was the screw holes in the bottom panel for the hdd. did the marks by measurements, then test aligned with a spare hdd to confirm

pressed them out

test fit...

win

visited m2h south and the scroll saw. cut out the IO. before filing...

after filing

prepped a test fit

connected some stuff to see that the plug housing cleared the 1/4" acrylic

usb was a shade tight, did some more filing after this pic

rounded off the small green panel that will be inside the case covering the two upper holes in the front. mainly for inner asthetics and to not get nicked when assembling

needed to make the top blowhole, marked off...

prep

blew it out, then realized, AGAIN, forgot to get screw hole marks while I still had center

, back to trusty ac ryan grille. marked them off and pressed them out

measured the feet insert diameter on the new digital caliper

light was fading and I needed to play drums for a bit so I shut it down, mike

pretty much I am left with sanding and polishing, cube bonding, and assembly, I think

I wanted it to be done today but that aint happening, so hopefully by next weekend
thanks for watching