Overclock.net › Forums › Industry News › Hardware News › [The Register] AMD readies Bulldozers to ship next month
New Posts  All Forums:Forum Nav:

[The Register] AMD readies Bulldozers to ship next month - Page 8

post #71 of 144
Key word; expect. That doesn't signify a launch.

If they said "We are launching Bulldozer in ___ " it would be a different story.

Road maps from that same day still had 2H as the expected launch time frame. Which is End of June/Start of July till end of December.
Test Bed
(24 items)
 
TTTbox
(15 items)
 
 
CPUMotherboardGraphicsRAM
Core i5 3570K  Biostar TZ774XE Power Color AX5770 1GB 4x4GB 1866Mhz 9-10-9-27-2T 
Hard DriveHard DriveHard DriveHard Drive
Samsung Spinpoint F3 1TB Samsung Spinpoint F3 1TB Western Digital Green 2TB Samsung Spinpoint M4 500GB 
Hard DriveOptical DriveCoolingOS
Intel X-25M G2 80GB Lite-On BluRay Drive Arctic Cooling Freezer 13 Pro Windows 7 Ultimate 
MonitorKeyboardPowerCase
Dell U2212HM Deck Legend Frost Tactile Silverstone Strider Plus 750w Custom Acrylic Test Bed 
MouseMouse PadAudioAudio
Logitech G500 Cooler Master Storm Tactics FPS Beyer Dynamics DT-990 600ohm Samson MediaOne 3A 
AudioAudioOtherOther
FiiO E09k QOGIR FiiO E17 ALPEN Microsoft Lifecam Studio Blue Yeti Pro Microphone 
CPUMotherboardGraphicsRAM
AMD A10-A5800K ASRock FM2A85X-ITX Radeon HD7770 1GB 2x8GB 1866mhz C9 
Hard DriveHard DriveOptical DriveCooling
SanDisk Ultra Plus 128GB 2TB 5400 RPM  24x DVD Drive Noctua L9A 
OSMonitorKeyboardPower
Windows 7 Home Premium 32" IPS TV Logitech K400 Seasonic G360 
CaseMouseAudio
Cooler Master Elite 120 Advanced Logitech K400 Trackpad Custom 2.1 Home Theater Setup 
  hide details  
Reply
Test Bed
(24 items)
 
TTTbox
(15 items)
 
 
CPUMotherboardGraphicsRAM
Core i5 3570K  Biostar TZ774XE Power Color AX5770 1GB 4x4GB 1866Mhz 9-10-9-27-2T 
Hard DriveHard DriveHard DriveHard Drive
Samsung Spinpoint F3 1TB Samsung Spinpoint F3 1TB Western Digital Green 2TB Samsung Spinpoint M4 500GB 
Hard DriveOptical DriveCoolingOS
Intel X-25M G2 80GB Lite-On BluRay Drive Arctic Cooling Freezer 13 Pro Windows 7 Ultimate 
MonitorKeyboardPowerCase
Dell U2212HM Deck Legend Frost Tactile Silverstone Strider Plus 750w Custom Acrylic Test Bed 
MouseMouse PadAudioAudio
Logitech G500 Cooler Master Storm Tactics FPS Beyer Dynamics DT-990 600ohm Samson MediaOne 3A 
AudioAudioOtherOther
FiiO E09k QOGIR FiiO E17 ALPEN Microsoft Lifecam Studio Blue Yeti Pro Microphone 
CPUMotherboardGraphicsRAM
AMD A10-A5800K ASRock FM2A85X-ITX Radeon HD7770 1GB 2x8GB 1866mhz C9 
Hard DriveHard DriveOptical DriveCooling
SanDisk Ultra Plus 128GB 2TB 5400 RPM  24x DVD Drive Noctua L9A 
OSMonitorKeyboardPower
Windows 7 Home Premium 32" IPS TV Logitech K400 Seasonic G360 
CaseMouseAudio
Cooler Master Elite 120 Advanced Logitech K400 Trackpad Custom 2.1 Home Theater Setup 
  hide details  
Reply
post #72 of 144
those were old roadmaps and not too long ago jf-amd did say on another forum that desktop got pulled back by one quarter right after the june 1st announcement of the 60-90 day availability ..
My System
(13 items)
 
  
CPUMotherboardGraphicsRAM
FX 8120 Asus crosshair V formula 2 msi HD6870 Twin Frozr II CORSAIR Vengeance 8GB 
Hard DriveOptical DriveOSMonitor
2 SAMSUNG F4 2TB boot + 4 WD 2TB storage Lite On blu ray player win 7 sp1 oem Asus VH236H @ 1920 x 1080 
KeyboardPowerCaseMouse
logitech Media Elite Keyboard ENERMAX MAXREVO 1350W psu SILVERSTONE RAVEN RV02B-EW Matte black logitech OEM 
  hide details  
Reply
My System
(13 items)
 
  
CPUMotherboardGraphicsRAM
FX 8120 Asus crosshair V formula 2 msi HD6870 Twin Frozr II CORSAIR Vengeance 8GB 
Hard DriveOptical DriveOSMonitor
2 SAMSUNG F4 2TB boot + 4 WD 2TB storage Lite On blu ray player win 7 sp1 oem Asus VH236H @ 1920 x 1080 
KeyboardPowerCaseMouse
logitech Media Elite Keyboard ENERMAX MAXREVO 1350W psu SILVERSTONE RAVEN RV02B-EW Matte black logitech OEM 
  hide details  
Reply
post #73 of 144
Quote:
Originally Posted by Fr0sty View Post
but amd did say bulldozer was pushed back ....


at least the desktop variant ....


so it wasnt released or shipped Q2 for revenue or anything that you are trying to hint at
Did you read the information in the photo? BD has most likely shipped to vendors already awaiting the launch of the product. How do you think when the product launches, say HP, Dell and other retailers, magically already have the computers ready to go the same day? It's called stock lead time. Look at the photo again, it says "Shipped to retail" in March 2011, "Launch" in June. 90 days is what it took to get to the "Launch" phase of the product. BD is going to be the same way, and BD is not just going to be released as a OEM bulk processor or retail PIB, but it will also be IN pre-built systems, consumer and server, which as I stated above that those manufactures need that 90 day lead time to make enough products to cover demand at "Launch". It all makes sense. All the "BD is late" rants are totally worthless, because when the product releases, the product releases, and the only power we as consumers have is the choice we make on what brand we will buy, or to wait for what we want.
BULLDOZER!!!
(14 items)
 
  
CPUMotherboardGraphicsRAM
8120FX Gigabyte GA-990FXA-UD7 2ea MSI r9-270x 16gb G-Skill Snipers 
Hard DriveOptical DriveCoolingOS
WD 3x1tb greens, 1x1tb black Adata S599 120gb LG DVDR/RW, LG Blueray CM V8 Win7 64bit 
MonitorKeyboardPowerCase
LG2762D Microsoft Antec TPN-750 CM HAF 932 
MouseMouse Pad
Microsoft X5 Generic 
  hide details  
Reply
BULLDOZER!!!
(14 items)
 
  
CPUMotherboardGraphicsRAM
8120FX Gigabyte GA-990FXA-UD7 2ea MSI r9-270x 16gb G-Skill Snipers 
Hard DriveOptical DriveCoolingOS
WD 3x1tb greens, 1x1tb black Adata S599 120gb LG DVDR/RW, LG Blueray CM V8 Win7 64bit 
MonitorKeyboardPowerCase
LG2762D Microsoft Antec TPN-750 CM HAF 932 
MouseMouse Pad
Microsoft X5 Generic 
  hide details  
Reply
post #74 of 144
Quote:
Originally Posted by Tator Tot View Post
Key word; expect. That doesn't signify a launch.

If they said "We are launching Bulldozer in ___ " it would be a different story.

Road maps from that same day still had 2H as the expected launch time frame. Which is End of June/Start of July till end of December.
Helping you out by helping me out

Quote:
Originally Posted by JF-AMD
Product Schedules – This is the most asked question that I get. Today we gave granularity down to the quarter. We expect to launch the client version of “Bulldozer” (code named “Zambezi”) in Q2 2011. The server products (“Interlagos” and “Valencia”) will first begin production in Q2 2011, and we expect to launch them in Q3 2011.
He is the marketing guy and the server one for that

Quote:
Originally Posted by Obakemono View Post
Did you read the information in the photo? BD has most likely shipped to vendors already awaiting the launch of the product. How do you think when the product launches, say HP, Dell and other retailers, magically already have the computers ready to go the same day? It's called stock lead time. Look at the photo again, it says "Shipped to retail" in March 2011, "Launch" in June. 90 days is what it took to get to the "Launch" phase of the product. BD is going to be the same way, and BD is not just going to be released as a OEM bulk processor or retail PIB, but it will also be IN pre-built systems, consumer and server, which as I stated above that those manufactures need that 90 day lead time to make enough products to cover demand at "Launch". It all makes sense. All the "BD is late" rants are totally worthless, because when the product releases, the product releases, and the only power we as consumers have is the choice we make on what brand we will buy, or to wait for what we want.
The motherboards are already out for Zambezi

FM1 Motherboard availability is what stalled the Llano launch
Edited by Seronx - 7/22/11 at 2:49pm
AMD FX ~Seronx
(16 items)
 
  
CPUMotherboardGraphicsRAM
FX-9800P Acer Wasp R7 M440 SK Hynix HMA41GS6AFR8N-TF 
Hard DriveHard DriveOptical DriveCooling
KINGSTON RBU-SNS8152S3128GG2 TOSHIBA MQ01ABD100 HL-DT-ST DVDRAM GUE1N Stock 
OSMonitorKeyboardPower
Microsoft Windows 10 Home Build 14393 Viewsonic XG2401 24 Hz-144 Hz Ducky Channel Shine 3 Stock 65W 
CaseMouseMouse PadAudio
Acer Exoskeleton Steelseries Rival 300 Razer Megasoma AMD-Realtek ALC255 
  hide details  
Reply
AMD FX ~Seronx
(16 items)
 
  
CPUMotherboardGraphicsRAM
FX-9800P Acer Wasp R7 M440 SK Hynix HMA41GS6AFR8N-TF 
Hard DriveHard DriveOptical DriveCooling
KINGSTON RBU-SNS8152S3128GG2 TOSHIBA MQ01ABD100 HL-DT-ST DVDRAM GUE1N Stock 
OSMonitorKeyboardPower
Microsoft Windows 10 Home Build 14393 Viewsonic XG2401 24 Hz-144 Hz Ducky Channel Shine 3 Stock 65W 
CaseMouseMouse PadAudio
Acer Exoskeleton Steelseries Rival 300 Razer Megasoma AMD-Realtek ALC255 
  hide details  
Reply
post #75 of 144
so this is another bs bulldozer thread then...I remember the only credible information from amd was the 60-90 day timeframe if I'm not mistaken.
Black Silence
(15 items)
 
  
CPUMotherboardRAMHard Drive
i5 3570k @ 4.5 GHz Asus P8Z77-M Pro Kingston HyperX Genesis 8 GB - 1600 MHz Seagate Barracuda 250 GB 
Optical DriveCoolingOSMonitor
Samsung WriteMaster Noctua NH-D14 Windows 10 ASUS VS24AH-P 
KeyboardPowerCaseMouse
Logitech Navigator Enermax Infiniti 650W Fractal R3 Black Pearl Razer Death Adder 
Mouse PadAudio
SteelSeries QcK Mass Altec Lansing FX4021 
  hide details  
Reply
Black Silence
(15 items)
 
  
CPUMotherboardRAMHard Drive
i5 3570k @ 4.5 GHz Asus P8Z77-M Pro Kingston HyperX Genesis 8 GB - 1600 MHz Seagate Barracuda 250 GB 
Optical DriveCoolingOSMonitor
Samsung WriteMaster Noctua NH-D14 Windows 10 ASUS VS24AH-P 
KeyboardPowerCaseMouse
Logitech Navigator Enermax Infiniti 650W Fractal R3 Black Pearl Razer Death Adder 
Mouse PadAudio
SteelSeries QcK Mass Altec Lansing FX4021 
  hide details  
Reply
post #76 of 144
Quote:
Originally Posted by surfbumb View Post
so this is another bs bulldozer thread then...I remember the only credible information from amd was the 60-90 day timeframe if I'm not mistaken.
The comments in this thread are mostly FUD

But The Register and AMD have confirmed with each other that the Computex annoucement is indeed true

60-90 days from June 1st

equals August availability @ retail
Edited by Seronx - 7/22/11 at 2:50pm
AMD FX ~Seronx
(16 items)
 
  
CPUMotherboardGraphicsRAM
FX-9800P Acer Wasp R7 M440 SK Hynix HMA41GS6AFR8N-TF 
Hard DriveHard DriveOptical DriveCooling
KINGSTON RBU-SNS8152S3128GG2 TOSHIBA MQ01ABD100 HL-DT-ST DVDRAM GUE1N Stock 
OSMonitorKeyboardPower
Microsoft Windows 10 Home Build 14393 Viewsonic XG2401 24 Hz-144 Hz Ducky Channel Shine 3 Stock 65W 
CaseMouseMouse PadAudio
Acer Exoskeleton Steelseries Rival 300 Razer Megasoma AMD-Realtek ALC255 
  hide details  
Reply
AMD FX ~Seronx
(16 items)
 
  
CPUMotherboardGraphicsRAM
FX-9800P Acer Wasp R7 M440 SK Hynix HMA41GS6AFR8N-TF 
Hard DriveHard DriveOptical DriveCooling
KINGSTON RBU-SNS8152S3128GG2 TOSHIBA MQ01ABD100 HL-DT-ST DVDRAM GUE1N Stock 
OSMonitorKeyboardPower
Microsoft Windows 10 Home Build 14393 Viewsonic XG2401 24 Hz-144 Hz Ducky Channel Shine 3 Stock 65W 
CaseMouseMouse PadAudio
Acer Exoskeleton Steelseries Rival 300 Razer Megasoma AMD-Realtek ALC255 
  hide details  
Reply
post #77 of 144
Quote:
Originally Posted by Obakemono View Post
Did you read the information in the photo? BD has most likely shipped to vendors already awaiting the launch of the product. How do you think when the product launches, say HP, Dell and other retailers, magically already have the computers ready to go the same day? It's called stock lead time. Look at the photo again, it says "Shipped to retail" in March 2011, "Launch" in June. 90 days is what it took to get to the "Launch" phase of the product. BD is going to be the same way, and BD is not just going to be released as a OEM bulk processor or retail PIB, but it will also be IN pre-built systems, consumer and server, which as I stated above that those manufactures need that 90 day lead time to make enough products to cover demand at "Launch". It all makes sense. All the "BD is late" rants are totally worthless, because when the product releases, the product releases, and the only power we as consumers have is the choice we make on what brand we will buy, or to wait for what we want.

do you think amd would have made some sort of announcement yesterday about shipping for revenue to oem if it was the case???


investors and shareholders want to know those things .. especially something that was hyped for so long ... since we didnt hear about it.. ill go ahead and assume it didnt ship for revenue ... meaning no oem sales ... wich is prebuilt dells and crap like that ...
My System
(13 items)
 
  
CPUMotherboardGraphicsRAM
FX 8120 Asus crosshair V formula 2 msi HD6870 Twin Frozr II CORSAIR Vengeance 8GB 
Hard DriveOptical DriveOSMonitor
2 SAMSUNG F4 2TB boot + 4 WD 2TB storage Lite On blu ray player win 7 sp1 oem Asus VH236H @ 1920 x 1080 
KeyboardPowerCaseMouse
logitech Media Elite Keyboard ENERMAX MAXREVO 1350W psu SILVERSTONE RAVEN RV02B-EW Matte black logitech OEM 
  hide details  
Reply
My System
(13 items)
 
  
CPUMotherboardGraphicsRAM
FX 8120 Asus crosshair V formula 2 msi HD6870 Twin Frozr II CORSAIR Vengeance 8GB 
Hard DriveOptical DriveOSMonitor
2 SAMSUNG F4 2TB boot + 4 WD 2TB storage Lite On blu ray player win 7 sp1 oem Asus VH236H @ 1920 x 1080 
KeyboardPowerCaseMouse
logitech Media Elite Keyboard ENERMAX MAXREVO 1350W psu SILVERSTONE RAVEN RV02B-EW Matte black logitech OEM 
  hide details  
Reply
post #78 of 144
BD was expected to launch in June, AMD themselves admitted it was delayed 60 - 90 days.

So let's see, now it's coming out in August which is within the 60-90 day time frame given, after the delay was acknowledged.

Sources?

Way too many to list.
2010rig
(14 items)
 
Galaxy S3
(8 items)
 
 
CPUMotherboardGraphicsRAM
X5660 @ 4.5  ASUS P6X58D-E 980TI? 12GB OCZ Platinum - 7-7-7-21 
Hard DriveCoolingOSMonitor
1 80GB SSD x25m - 3TB F3 + F4 NH-D14 Windows 7 Ultimate LG 47LH55 
KeyboardPowerCaseMouse
Natural Wireless Keyboard Corsair 750HX CM 690 II Advanced MX 518 
CPUGraphicsRAMHard Drive
Snapdragon S4 Dual core 1500mhz Adreno 225 Samsung 2GB 16GB Onboard Flash 
OSMonitorPowerCase
Android 4.4.2 - CM11 4.8" AMOLED 1280x720 2100 mAh battery Otterbox Defender 
  hide details  
Reply
2010rig
(14 items)
 
Galaxy S3
(8 items)
 
 
CPUMotherboardGraphicsRAM
X5660 @ 4.5  ASUS P6X58D-E 980TI? 12GB OCZ Platinum - 7-7-7-21 
Hard DriveCoolingOSMonitor
1 80GB SSD x25m - 3TB F3 + F4 NH-D14 Windows 7 Ultimate LG 47LH55 
KeyboardPowerCaseMouse
Natural Wireless Keyboard Corsair 750HX CM 690 II Advanced MX 518 
CPUGraphicsRAMHard Drive
Snapdragon S4 Dual core 1500mhz Adreno 225 Samsung 2GB 16GB Onboard Flash 
OSMonitorPowerCase
Android 4.4.2 - CM11 4.8" AMOLED 1280x720 2100 mAh battery Otterbox Defender 
  hide details  
Reply
post #79 of 144
Quote:
Originally Posted by Seronx View Post

The motherboards are already out for Zambezi
I think that might have been a bit pre-mature with the BD situation, but who really knows.
BULLDOZER!!!
(14 items)
 
  
CPUMotherboardGraphicsRAM
8120FX Gigabyte GA-990FXA-UD7 2ea MSI r9-270x 16gb G-Skill Snipers 
Hard DriveOptical DriveCoolingOS
WD 3x1tb greens, 1x1tb black Adata S599 120gb LG DVDR/RW, LG Blueray CM V8 Win7 64bit 
MonitorKeyboardPowerCase
LG2762D Microsoft Antec TPN-750 CM HAF 932 
MouseMouse Pad
Microsoft X5 Generic 
  hide details  
Reply
BULLDOZER!!!
(14 items)
 
  
CPUMotherboardGraphicsRAM
8120FX Gigabyte GA-990FXA-UD7 2ea MSI r9-270x 16gb G-Skill Snipers 
Hard DriveOptical DriveCoolingOS
WD 3x1tb greens, 1x1tb black Adata S599 120gb LG DVDR/RW, LG Blueray CM V8 Win7 64bit 
MonitorKeyboardPowerCase
LG2762D Microsoft Antec TPN-750 CM HAF 932 
MouseMouse Pad
Microsoft X5 Generic 
  hide details  
Reply
post #80 of 144
Quote:
Originally Posted by Fr0sty View Post
do you think amd would have made some sort of announcement yesterday about shipping for revenue to oem if it was the case???


investors and shareholders want to know those things .. especially something that was hyped for so long ... since we didnt hear about it.. ill go ahead and assume it didnt ship for revenue ... meaning no oem sales ... wich is prebuilt dells and crap like that ...
Except Dell only does Intel Enthusiast machines
*cough*Alienware*cough*

If you are talking about ibuypower, cyberpowerpc, and other places like such then you would be correct

Quote:
Originally Posted by Obakemono View Post
I think that might have been a bit pre-mature with the BD situation, but who really knows.
What?

Quote:
Originally Posted by 2010rig View Post
BD was expected to launch in June, AMD themselves admitted it was delayed 60 - 90 days.

So let's see, now it's coming out in August which is within the 60-90 day time frame given, after the delay was acknowledged.

Sources?

Way too many to list.
False

AMD has only admitted anywhere 2011, thus no delay
Edited by Seronx - 7/22/11 at 2:57pm
AMD FX ~Seronx
(16 items)
 
  
CPUMotherboardGraphicsRAM
FX-9800P Acer Wasp R7 M440 SK Hynix HMA41GS6AFR8N-TF 
Hard DriveHard DriveOptical DriveCooling
KINGSTON RBU-SNS8152S3128GG2 TOSHIBA MQ01ABD100 HL-DT-ST DVDRAM GUE1N Stock 
OSMonitorKeyboardPower
Microsoft Windows 10 Home Build 14393 Viewsonic XG2401 24 Hz-144 Hz Ducky Channel Shine 3 Stock 65W 
CaseMouseMouse PadAudio
Acer Exoskeleton Steelseries Rival 300 Razer Megasoma AMD-Realtek ALC255 
  hide details  
Reply
AMD FX ~Seronx
(16 items)
 
  
CPUMotherboardGraphicsRAM
FX-9800P Acer Wasp R7 M440 SK Hynix HMA41GS6AFR8N-TF 
Hard DriveHard DriveOptical DriveCooling
KINGSTON RBU-SNS8152S3128GG2 TOSHIBA MQ01ABD100 HL-DT-ST DVDRAM GUE1N Stock 
OSMonitorKeyboardPower
Microsoft Windows 10 Home Build 14393 Viewsonic XG2401 24 Hz-144 Hz Ducky Channel Shine 3 Stock 65W 
CaseMouseMouse PadAudio
Acer Exoskeleton Steelseries Rival 300 Razer Megasoma AMD-Realtek ALC255 
  hide details  
Reply
New Posts  All Forums:Forum Nav:
  Return Home
  Back to Forum: Hardware News
Overclock.net › Forums › Industry News › Hardware News › [The Register] AMD readies Bulldozers to ship next month