Overclock.net › Forums › Industry News › Hardware News › [The Register] AMD readies Bulldozers to ship next month
New Posts  All Forums:Forum Nav:

[The Register] AMD readies Bulldozers to ship next month - Page 9

post #81 of 144
Quote:
Originally Posted by Seronx View Post
Except Dell only does Intel Enthusiast machines
*cough*Alienware*cough*

If you are talking about ibuypower, cyberpowerpc, and other places like such then you would be correct



What?



False

sorry mate but 2010 is right ... its been plastered around this forum like many times over ...


yet people still think its never been delayed


if you add the fact that JF-AMD a guy who works for amd acknoledged it ...
My System
(13 items)
 
  
CPUMotherboardGraphicsRAM
FX 8120 Asus crosshair V formula 2 msi HD6870 Twin Frozr II CORSAIR Vengeance 8GB 
Hard DriveOptical DriveOSMonitor
2 SAMSUNG F4 2TB boot + 4 WD 2TB storage Lite On blu ray player win 7 sp1 oem Asus VH236H @ 1920 x 1080 
KeyboardPowerCaseMouse
logitech Media Elite Keyboard ENERMAX MAXREVO 1350W psu SILVERSTONE RAVEN RV02B-EW Matte black logitech OEM 
  hide details  
Reply
My System
(13 items)
 
  
CPUMotherboardGraphicsRAM
FX 8120 Asus crosshair V formula 2 msi HD6870 Twin Frozr II CORSAIR Vengeance 8GB 
Hard DriveOptical DriveOSMonitor
2 SAMSUNG F4 2TB boot + 4 WD 2TB storage Lite On blu ray player win 7 sp1 oem Asus VH236H @ 1920 x 1080 
KeyboardPowerCaseMouse
logitech Media Elite Keyboard ENERMAX MAXREVO 1350W psu SILVERSTONE RAVEN RV02B-EW Matte black logitech OEM 
  hide details  
Reply
post #82 of 144
that "...ember 19"=september 19 in the BD comicbook thing, what would it mean if not retail release date, some pre-release benchmark dates

they know many would think its release date, I don't think they would tease with an early date than actual, and not much point of a later date
Car replacement
(13 items)
 
  
CPUMotherboardGraphicsRAM
pII x4 40 @ 3.72GHz NB @ 2.79GHz M4A89gtd PRO/USB3 Sapphire 6950 2GB nonRef 950/1520 @1.2V 4GB Gskill DDR3 CL7eco @1656 6-8-6-20-24-1T 
Hard DriveOSMonitorPower
WD Black 640GB SATA3 Windows 7 Ultimate BenQ 24" G2420HD 1920x1080 SeaSonic M12II 520W 
Case
TV stand on wheels + cardboard door 
  hide details  
Reply
Car replacement
(13 items)
 
  
CPUMotherboardGraphicsRAM
pII x4 40 @ 3.72GHz NB @ 2.79GHz M4A89gtd PRO/USB3 Sapphire 6950 2GB nonRef 950/1520 @1.2V 4GB Gskill DDR3 CL7eco @1656 6-8-6-20-24-1T 
Hard DriveOSMonitorPower
WD Black 640GB SATA3 Windows 7 Ultimate BenQ 24" G2420HD 1920x1080 SeaSonic M12II 520W 
Case
TV stand on wheels + cardboard door 
  hide details  
Reply
post #83 of 144
Quote:
Originally Posted by Fr0sty View Post
do you think amd would have made some sort of announcement yesterday about shipping for revenue to oem if it was the case???


investors and shareholders want to know those things .. especially something that was hyped for so long ... since we didnt hear about it.. ill go ahead and assume it didnt ship for revenue ... meaning no oem sales ... wich is prebuilt dells and crap like that ...
I said shipped to R E T A I L, which means that AMD SOLD x-amount of CPUs to OEM manufacturers and retailers of parts, IE Newegg. That needs to happen before the pre-built systems are ready. Your "Crap" comment has no merit about OEMs, because OEMs sell allot of items to 95% of the people who only will look for the newest and fastest machine sitting on the shelf.

Quote:
Originally Posted by 2010rig View Post
BD was expected to launch in June, AMD themselves admitted it was delayed 60 - 90 days.

So let's see, now it's coming out in August which is within the 60-90 day time frame given, after the delay was acknowledged.

Sources?

Way too many to list.
So what if it was delayed by 60-90 days?
BULLDOZER!!!
(14 items)
 
  
CPUMotherboardGraphicsRAM
8120FX Gigabyte GA-990FXA-UD7 2ea MSI r9-270x 16gb G-Skill Snipers 
Hard DriveOptical DriveCoolingOS
WD 3x1tb greens, 1x1tb black Adata S599 120gb LG DVDR/RW, LG Blueray CM V8 Win7 64bit 
MonitorKeyboardPowerCase
LG2762D Microsoft Antec TPN-750 CM HAF 932 
MouseMouse Pad
Microsoft X5 Generic 
  hide details  
Reply
BULLDOZER!!!
(14 items)
 
  
CPUMotherboardGraphicsRAM
8120FX Gigabyte GA-990FXA-UD7 2ea MSI r9-270x 16gb G-Skill Snipers 
Hard DriveOptical DriveCoolingOS
WD 3x1tb greens, 1x1tb black Adata S599 120gb LG DVDR/RW, LG Blueray CM V8 Win7 64bit 
MonitorKeyboardPowerCase
LG2762D Microsoft Antec TPN-750 CM HAF 932 
MouseMouse Pad
Microsoft X5 Generic 
  hide details  
Reply
post #84 of 144
Quote:
Originally Posted by Seronx View Post




What?


Oh sorry, I was talking about the 9xx platform for the Zambezi CPUs.
BULLDOZER!!!
(14 items)
 
  
CPUMotherboardGraphicsRAM
8120FX Gigabyte GA-990FXA-UD7 2ea MSI r9-270x 16gb G-Skill Snipers 
Hard DriveOptical DriveCoolingOS
WD 3x1tb greens, 1x1tb black Adata S599 120gb LG DVDR/RW, LG Blueray CM V8 Win7 64bit 
MonitorKeyboardPowerCase
LG2762D Microsoft Antec TPN-750 CM HAF 932 
MouseMouse Pad
Microsoft X5 Generic 
  hide details  
Reply
BULLDOZER!!!
(14 items)
 
  
CPUMotherboardGraphicsRAM
8120FX Gigabyte GA-990FXA-UD7 2ea MSI r9-270x 16gb G-Skill Snipers 
Hard DriveOptical DriveCoolingOS
WD 3x1tb greens, 1x1tb black Adata S599 120gb LG DVDR/RW, LG Blueray CM V8 Win7 64bit 
MonitorKeyboardPowerCase
LG2762D Microsoft Antec TPN-750 CM HAF 932 
MouseMouse Pad
Microsoft X5 Generic 
  hide details  
Reply
post #85 of 144
Quote:
Originally Posted by Fr0sty View Post
sorry mate but 2010 is right ... its been plastered around this forum like many times over ...


yet people still think its never been delayed


if you add the fact that JF-AMD a guy who works for amd acknoledged it ...
Quote:
His postings are his own opinions and may not represent AMD’s positions, strategies or opinions. Links to third party sites are provided for convenience and unless explicitly stated, AMD is not responsible for the contents of such linked sites and no endorsement is implied.
If we want to say...he is an AMD employee...his opinions are not endorsed by AMD

Quote:
Originally Posted by Obakemono View Post
So what if it was delayed by 60-90 days?
It wasn't delayed

Quote:
Originally Posted by Obakemono View Post
Oh sorry, I was talking about the 9xx platform for the Zambezi CPUs.
http://www.newegg.com/Product/Produc...=1&name=AM3%2b

The motherboards came out in that 0-30 days it was announced to come out in

So, if they got the ecosystem ready the launch will be fast and swift
Edited by Seronx - 7/22/11 at 3:02pm
AMD FX ~Seronx
(16 items)
 
  
CPUMotherboardGraphicsRAM
FX-9800P Acer Wasp R7 M440 SK Hynix HMA41GS6AFR8N-TF 
Hard DriveHard DriveOptical DriveCooling
KINGSTON RBU-SNS8152S3128GG2 TOSHIBA MQ01ABD100 HL-DT-ST DVDRAM GUE1N Stock 
OSMonitorKeyboardPower
Microsoft Windows 10 Home Build 14393 Viewsonic XG2401 24 Hz-144 Hz Ducky Channel Shine 3 Stock 65W 
CaseMouseMouse PadAudio
Acer Exoskeleton Steelseries Rival 300 Razer Megasoma AMD-Realtek ALC255 
  hide details  
Reply
AMD FX ~Seronx
(16 items)
 
  
CPUMotherboardGraphicsRAM
FX-9800P Acer Wasp R7 M440 SK Hynix HMA41GS6AFR8N-TF 
Hard DriveHard DriveOptical DriveCooling
KINGSTON RBU-SNS8152S3128GG2 TOSHIBA MQ01ABD100 HL-DT-ST DVDRAM GUE1N Stock 
OSMonitorKeyboardPower
Microsoft Windows 10 Home Build 14393 Viewsonic XG2401 24 Hz-144 Hz Ducky Channel Shine 3 Stock 65W 
CaseMouseMouse PadAudio
Acer Exoskeleton Steelseries Rival 300 Razer Megasoma AMD-Realtek ALC255 
  hide details  
Reply
post #86 of 144
Quote:
Originally Posted by Obakemono View Post
So what if it was delayed by 60-90 days?
Umm, are you following this thread or just my 1 post?
2010rig
(14 items)
 
Galaxy S3
(8 items)
 
 
CPUMotherboardGraphicsRAM
X5660 @ 4.5  ASUS P6X58D-E 980TI? 12GB OCZ Platinum - 7-7-7-21 
Hard DriveCoolingOSMonitor
1 80GB SSD x25m - 3TB F3 + F4 NH-D14 Windows 7 Ultimate LG 47LH55 
KeyboardPowerCaseMouse
Natural Wireless Keyboard Corsair 750HX CM 690 II Advanced MX 518 
CPUGraphicsRAMHard Drive
Snapdragon S4 Dual core 1500mhz Adreno 225 Samsung 2GB 16GB Onboard Flash 
OSMonitorPowerCase
Android 4.4.2 - CM11 4.8" AMOLED 1280x720 2100 mAh battery Otterbox Defender 
  hide details  
Reply
2010rig
(14 items)
 
Galaxy S3
(8 items)
 
 
CPUMotherboardGraphicsRAM
X5660 @ 4.5  ASUS P6X58D-E 980TI? 12GB OCZ Platinum - 7-7-7-21 
Hard DriveCoolingOSMonitor
1 80GB SSD x25m - 3TB F3 + F4 NH-D14 Windows 7 Ultimate LG 47LH55 
KeyboardPowerCaseMouse
Natural Wireless Keyboard Corsair 750HX CM 690 II Advanced MX 518 
CPUGraphicsRAMHard Drive
Snapdragon S4 Dual core 1500mhz Adreno 225 Samsung 2GB 16GB Onboard Flash 
OSMonitorPowerCase
Android 4.4.2 - CM11 4.8" AMOLED 1280x720 2100 mAh battery Otterbox Defender 
  hide details  
Reply
post #87 of 144
Quote:
Originally Posted by Fr0sty View Post
sorry mate but 2010 is right ... its been plastered around this forum like many times over ...


yet people still think its never been delayed


if you add the fact that JF-AMD a guy who works for amd acknoledged it ...
Ummm, 99.9% of the "Plastered information" on BD has been all rumor and BS, this is from AMD, thus NOT RUMOR.
BULLDOZER!!!
(14 items)
 
  
CPUMotherboardGraphicsRAM
8120FX Gigabyte GA-990FXA-UD7 2ea MSI r9-270x 16gb G-Skill Snipers 
Hard DriveOptical DriveCoolingOS
WD 3x1tb greens, 1x1tb black Adata S599 120gb LG DVDR/RW, LG Blueray CM V8 Win7 64bit 
MonitorKeyboardPowerCase
LG2762D Microsoft Antec TPN-750 CM HAF 932 
MouseMouse Pad
Microsoft X5 Generic 
  hide details  
Reply
BULLDOZER!!!
(14 items)
 
  
CPUMotherboardGraphicsRAM
8120FX Gigabyte GA-990FXA-UD7 2ea MSI r9-270x 16gb G-Skill Snipers 
Hard DriveOptical DriveCoolingOS
WD 3x1tb greens, 1x1tb black Adata S599 120gb LG DVDR/RW, LG Blueray CM V8 Win7 64bit 
MonitorKeyboardPowerCase
LG2762D Microsoft Antec TPN-750 CM HAF 932 
MouseMouse Pad
Microsoft X5 Generic 
  hide details  
Reply
post #88 of 144
Quote:
Originally Posted by Obakemono View Post
I said shipped to R E T A I L, which means that AMD SOLD x-amount of CPUs to OEM manufacturers and retailers of parts, IE Newegg. That needs to happen before the pre-built systems are ready. Your "Crap" comment has no merit about OEMs, because OEMs sell allot of items to 95% of the people who only will look for the newest and fastest machine sitting on the shelf.



So what if it was delayed by 60-90 days?
what do you think im talking about??? Oo


newegg and dell acer best buy .... all of them ...


they buy from amd ... and we buy from them ....


and about the delay its nothing really ... but the only thing about that is people spreading lies or false information ... imagine when it will come time to analyse the bulldozer architecture Oo ... how hard it will be for people to get a grasp of what it is and how it works



Quote:
Originally Posted by Seronx View Post
If we want to say...he is an AMD employee...his opinions are not endorsed by AMD



It wasn't delayed
Oo

so we shouldnt listen to anything he says then ???
My System
(13 items)
 
  
CPUMotherboardGraphicsRAM
FX 8120 Asus crosshair V formula 2 msi HD6870 Twin Frozr II CORSAIR Vengeance 8GB 
Hard DriveOptical DriveOSMonitor
2 SAMSUNG F4 2TB boot + 4 WD 2TB storage Lite On blu ray player win 7 sp1 oem Asus VH236H @ 1920 x 1080 
KeyboardPowerCaseMouse
logitech Media Elite Keyboard ENERMAX MAXREVO 1350W psu SILVERSTONE RAVEN RV02B-EW Matte black logitech OEM 
  hide details  
Reply
My System
(13 items)
 
  
CPUMotherboardGraphicsRAM
FX 8120 Asus crosshair V formula 2 msi HD6870 Twin Frozr II CORSAIR Vengeance 8GB 
Hard DriveOptical DriveOSMonitor
2 SAMSUNG F4 2TB boot + 4 WD 2TB storage Lite On blu ray player win 7 sp1 oem Asus VH236H @ 1920 x 1080 
KeyboardPowerCaseMouse
logitech Media Elite Keyboard ENERMAX MAXREVO 1350W psu SILVERSTONE RAVEN RV02B-EW Matte black logitech OEM 
  hide details  
Reply
post #89 of 144
Quote:
Originally Posted by Seronx View Post
If we want to say...he is an AMD employee...his opinions are not endorsed by AMD
That is irrelevant in this discussion. That was taken directly from the 2010 Financial Analyst Day. He simply posted it up on his Blog to provide Insight and Details on what transpired on that day.

Quote:
His postings are his own opinions and may not represent AMD’s positions, strategies or opinions. Links to third party sites are provided for convenience and unless explicitly stated, AMD is not responsible for the contents of such linked sites and no endorsement is implied.
They are Referring to his Comments that he makes in regards to User asked questions and Guests asking questions.
post #90 of 144
Quote:
Originally Posted by Seronx View Post
It wasn't delayed
I know...

Quote:
Originally Posted by 2010rig View Post
Umm, are you following this thread or just my 1 post?
I was being sarcastic, because I for one don't really care IF BD was late or not.
BULLDOZER!!!
(14 items)
 
  
CPUMotherboardGraphicsRAM
8120FX Gigabyte GA-990FXA-UD7 2ea MSI r9-270x 16gb G-Skill Snipers 
Hard DriveOptical DriveCoolingOS
WD 3x1tb greens, 1x1tb black Adata S599 120gb LG DVDR/RW, LG Blueray CM V8 Win7 64bit 
MonitorKeyboardPowerCase
LG2762D Microsoft Antec TPN-750 CM HAF 932 
MouseMouse Pad
Microsoft X5 Generic 
  hide details  
Reply
BULLDOZER!!!
(14 items)
 
  
CPUMotherboardGraphicsRAM
8120FX Gigabyte GA-990FXA-UD7 2ea MSI r9-270x 16gb G-Skill Snipers 
Hard DriveOptical DriveCoolingOS
WD 3x1tb greens, 1x1tb black Adata S599 120gb LG DVDR/RW, LG Blueray CM V8 Win7 64bit 
MonitorKeyboardPowerCase
LG2762D Microsoft Antec TPN-750 CM HAF 932 
MouseMouse Pad
Microsoft X5 Generic 
  hide details  
Reply
New Posts  All Forums:Forum Nav:
  Return Home
  Back to Forum: Hardware News
Overclock.net › Forums › Industry News › Hardware News › [The Register] AMD readies Bulldozers to ship next month