post #11 of 11
what sux is my invoice is dated 2-11-09 4 days before rebate starts (about the time shipment arrived) dang...may send it in anyway and let them deny it or accept it if so xtra 10 for me I bought it for the performance anyway
Work in progress
(13 items)
 
  
CPUMotherboardGraphicsRAM
Q6600(1.2250VID) 2.925Ghz (325*9) MSI P6N Diamond ASUS 8800GT 512 G.SKILL 2x1GB DDR2 800 
Hard DriveOptical DriveOSMonitor
74 G raptor, 640 G WD memorex duel layer XP sp2 Viewsonic 20" Lcd 
Power
antec 650 trio 
  hide details  
Reply
Work in progress
(13 items)
 
  
CPUMotherboardGraphicsRAM
Q6600(1.2250VID) 2.925Ghz (325*9) MSI P6N Diamond ASUS 8800GT 512 G.SKILL 2x1GB DDR2 800 
Hard DriveOptical DriveOSMonitor
74 G raptor, 640 G WD memorex duel layer XP sp2 Viewsonic 20" Lcd 
Power
antec 650 trio 
  hide details  
Reply