Joined
·
137 Posts
TJ11 MOD 1.0
http://foro.noticias3d.com/vbulletin/showthread.php?t=365159
Quote:
SKETCHES MOD 2.0After a long period of quiet and calm, I return with the empty glass.
I want fill the glass with many wanting to improve the computer, looking forward to re-learn things (many) and especially eager to enjoy the WC again.
So I am strong enough to do the 2.0 version of the TJ11.
This project, unlike the previous one, we'll take it more calmly enjoying every moment without rushing.
Well now I know more or less how I want to do ........
Lower part, SR-1 480 & SR-1 360 (adjusting it ahead so that there is room between the cables and Psu)

As noted above, the SR-1 240 anchored at the bay and deposit in it (using a grid that can put the clamps of deposit) and SR-1 120 through the back exit.

Overview


Lower part, SR-1 480 & SR-1 360 (adjusting it ahead so that there is room between the cables and Psu)
As noted above, the SR-1 240 anchored at the bay and deposit in it (using a grid that can put the clamps of deposit) and SR-1 120 through the back exit.
Overview